| Ongoing Projects |
Vees Mount Villas, Kalathilpady
 |
|
| MD:DUBAI Visit on 2008 MAY 2-3 |
Vees Vally Villas, Manarcadu
|
|
| |
|
| Completed Villas |
 |
Vee's Villa
|
This was our first venture in
real estate development project, located at Thellakom, Kottayam. Vee's
Villa's is one of our remarkable projects that enhanced a
glittering life style in Kottayam.
|
| Vee's Garden |
| |
Independent
2-3 bed room houses with all facilities for small families.
|
| |
Dependable
electricity, water supply and sanitary connections
|
| |
Ideally situated locality - barely 5 km
from Kottayam town. |
| |
Located very near to
the guest house and is about 1.5 km from Kodimatha.
|
| |
A quite locality for
peaceful living
|
| |
All round compound
walls / retaining walls provide privacy as well as safety.
|
| |
Access to each plot is
ensured through tarred internal roads with drains.
|
| |
Finance can be
arranged through National Banks
|
|
|
| Building Specification |
 |
| Ceramic tiles/ Mosaic tiles |
| Kitchen |
| Kitchen platform with marble top and stainless steel sink. |
| Toilet |
|
Ceramic tiles for floor and glazed tiles upto a height of 1.50 m for side
walls. White sanitary fittings & C.P.fittings, hot and cold mix tap with
shower, provision for geyser. |
| Windows and doors |
| Teak wood entrance door, seasoned hard wood for
windows and door frames. Windows with M.S.Grill & glazed shutters. Door
panalled / flush. |
| Painting |
| Oil bound distemper finish for inside walls , cement
paint for external walls, enamel paint for wood work and grill. |
| Electrical |
| Concealed wiring in conduits with PVC insulated copper
cable for lights, fans, socket, 3 pin 15A for power points. Distribution switch
board 3 phase with ELCB and MCB's including indepentent energy meter. T.V.
point and telephone point in concealed conduits. |
| Car Parking |
| Each Villa has its own car porch. |
| Payment |
| Payment to be made in 5 installments. |
| |
On Booking: 30% of the
total cost +S.T |
| |
On completion of foundation: 25% of
the total cost + S.T |
| |
On completion of G.Floor slab: 25%
of the total cost +S.T |
| |
On completion of first floor slab: 19.5%
of the total cost +S.T |
| |
On handing over: Balance + S.T +
other deposits |
|
| |
| Picture Gallery |

Alphonsa Shrine
Kudamaloor |

Benediction Sisters
Punaloor |

Benediction Sisters
Punaloor |

Carmelite Hostel, A Project of
Carmelite Provincial House, Palai |

Devamatha Hospital
Koothattukulam |

Holy Cross Higher secondary School
|

Kottayam Integrated Powerloom
Amayannoor |

K.E.College
Mannaram |

Oldage Home Kadanadu
A project of Bishop's House |

Tabore Prayer center
Elivally, Pala |

Marian Medical Centre
Pala |

CMC Hospital
Pala |

Adoration Nursary School
Edathua
|
All Koshys All Spices |

Parithrana Bhavan
Adichira |

Lourd Matha Hospital
Pacha |
Vees Gardev Villa |
Kerala Integrated Powerloom |
|
|
|