This was our first venture in
real estate development project, located at Thellakom, Kottayam.
Vee's Villa's is one of our remarkable projects
that enhanced a glittering life style in Kottayam. |
|
 |
|
|
| |
Vee's
garden |
|
| |
|
|
| |
|
Independent
2-3 bed room houses with all facilities for small families.
|
|
Dependable
electricity, water supply and sanitary connections
|
|
Ideally situated locality –
barely 5 km from Kottayam town. |
|
Located very
near to the guest house and is about 1.5 km from Kodimatha.
|
|
A quite locality
for peaceful living |
|
All round compound
walls / retaining walls provide privacy as well as safety.
|
|
Access to each
plot is ensured through tarred internal roads with drains.
|
|
Finance can
be arranged through National Banks
|
|
|
| |
| |
|
|
| |
Building Specification |
| |
Ceramic tiles/ Mosaic tiles |
| |
|
| |
Kitchen |
| |
Kitchen platform with marble top and stainless
steel sink. |
| |
|
| |
Toilet |
|
| |
Ceramic tiles for floor and glazed
tiles upto a height of 1.50 m for side walls. White sanitary fittings
& C.P.fittings, hot and cold mix tap with shower, provision
for geyser. |
|
| |
|
|
| |
Windows and doors |
|
| |
Teak wood entrance door, seasoned
hard wood for windows and door frames. Windows with M.S.Grill &
glazed shutters. Door panalled / flush. |
|
| |
|
|
| |
Painting |
|
| |
Oil bound distemper finish for inside walls , cement
paint for external walls, enamel paint for wood work and grill. |
|
| |
|
|
| |
Electrical |
|
| |
Concealed wiring in conduits with
PVC insulated copper cable for lights, fans, socket, 3 pin 15A for
power points. Distribution switch board 3 phase with ELCB and MCB’s
including indepentent energy meter. T.V. point and telephone point
in concealed conduits. |
|
| |
|
|
| |
Car Parking |
|
| |
Each Villa has its own car porch. |
|
| |
|
|
| |
Payment |
|
| |
Payment to be made in 5 installments. |
|
| |
|
|
| |
|
On Booking:
30% of the total cost +S.T |
|
On completion of foundation:
25% of the total cost + S.T |
|
On completion of G.Floor
slab: 25% of the total cost +S.T |
|
On completion of first floor
slab: 19.5% of the total cost +S.T |
|
On handing over:
Balance + S.T + other deposits |
|
|
| |
|
|